IR Lifecycle
The four NIST SP 800-61 phases, and which pages here serve each one.
Most of this site works inside one phase on one artifact. This is the frame around it. The phases follow NIST SP 800-61, the model most published IR plans use.
Each phase lists the work, the failure it is known for, and the pages here that serve it.
4 rows.
| Phase | Purpose |
|---|---|
| Preparation | Decide, before an incident, what you will be able to answer during one. |
| Detection & Analysis | Work out whether something happened, what it was, and how far it reached. |
| Containment, Eradication & Recovery | Stop it, remove it, and get back to normal without destroying the evidence for why. |
| Post-Incident Activity | Convert what the incident cost you into something that changes the next one. |